Standard on every new installation
10-Year
Coatings Warranty
Every new polyaspartic installation is backed by a 10-year written warranty against peeling, delamination and premature wear. It's included on every job — no warranty upsell required.
Orlando & Central Florida
We install polyaspartic floor coatings across Orlando for garages, patios and commercial floors. Polyaspartic is built for this climate: color that holds up in full sun, and a system engineered to resist hot tire pickup.

01Real reviews
Pulled live from our Google Business Profile.
02Backed in writing
Standard on every new installation
10-Year
Every new polyaspartic installation is backed by a 10-year written warranty against peeling, delamination and premature wear. It's included on every job — no warranty upsell required.
Optional upgrade
Lifetime
Enroll in our maintenance plan and your coverage extends to a lifetime warranty. Periodic care keeps the coating performing the way it did on day one. Ask about it at your free estimate.
03Applications

A common application, and where hot tire resistance earns what the system costs.

Sun-exposed exterior concrete, where UV stability is a major specification factor.

Retail, shops and back-of-house areas, scheduled around the hours your business is actually open.

Appearance under display lighting; many qualifying installations are completed in a single visit to the space.

Chemical and hot tire exposure, phased bay by bay so the shop keeps working.

The hybrid build: epoxy for the body, polyaspartic on top for UV stability.
Sun-exposed patios and lanais are where the UV argument stops being theoretical and starts being the reason to choose it.
Garages are a common setting for this work. If a straight epoxy build fits your garage better, see our dedicated garage floor coatings page for the full flake, solid and metallic finish lineup.
Larger jobs get the same treatment as our broader commercial concrete coatings work — scheduled around your hours, not ours.
04Why polyaspartic
Aliphatic polyaspartics hold their color in direct sunlight where conventional epoxy can amber.
Resists the hot tire pickup that lifts poorly specified coatings off a garage slab.
A properly cured system resists many common automotive and household spills when they're cleaned up promptly. Resistance varies by chemical and exposure time.
Many installations are completed in one visit, though the floor is not back in service that day.
Selected polyaspartic systems can cure across a broader temperature range, which can matter in August.
Available in flake and solid-color finishes, including all of SCDS's stocked flake blends.
UV stability matters most in Florida: sun-exposed aprons, patios and door thresholds are where conventional epoxy shows its limits first.
05Which system
Both are resin coatings over a prepared slab. Three things actually differ.
| Installation and recoat time | In Florida sun | Best when | |
|---|---|---|---|
| Polyaspartic | Working time measured in minutes; many single-day installs | Better UV and color stability than conventional epoxy | The floor sees sun, or hot tire pickup is a concern |
| Epoxy | Longer working time; larger builds can run more than a day | Can amber without a UV-stable topcoat | You want build, value and the widest color options |
| Epoxy base, polyaspartic top | Epoxy build time, plus a polyaspartic topcoat step | Better UV and color stability from the polyaspartic top coat | You want epoxy build with polyaspartic protection |
Customer access times are the same either way. SCDS specifies at least 24 hours before foot traffic and 48 hours before vehicles on every coatings job, epoxy or polyaspartic. What polyaspartic actually shortens is installation and recoat time — not how soon you can use the finished floor.
See every stocked blend on our color options page, and our full epoxy floor installation options are there if a straight epoxy build fits your slab better.
06Access times

SCDS recommends waiting at least 24 hours before foot traffic and 48 hours before parking a vehicle. We confirm your access times in writing before the crew leaves. If job-site conditions require additional time, we will tell you.
A polyaspartic coating can feel dry before it is ready for normal use. Our return-to-service times give the installed system time to cure before it takes vehicle weight, hot tires and turning forces.

Some polyaspartic systems advertise extremely fast return to service. Actual timing depends on the products installed, slab temperature, moisture and conditions during application.
We follow the requirements for the SCDS coating system and warranty rather than using the earliest possible touch-dry time. Our goal is simple: return your floor to service quickly, without rushing the preparation that protects it long-term.
We would rather give your floor the time it needs than rush the return to service.

07Preparation
Many polyaspartic floors can be installed in a single day. The slab condition, project size, selected system and conditions during installation all affect that timeline. Fast-cure chemistry shortens coating and recoat times — it does not eliminate surface preparation.
The slab still has to be ground, evaluated for moisture, and repaired at cracks and joints before the coating goes down. That preparation is invisible once the floor is finished, but it's one of the biggest factors in how well the coating bonds.
Cleaning concrete is not the same as grinding it. Likewise, an undiscovered moisture condition can put adhesion at risk even when the coating itself cures quickly.
The same principle applies to access times. How soon you can walk or drive on the floor depends on the system, the manufacturer's guidance, and jobsite conditions like slab temperature and humidity. SCDS's standard is 24 hours before walking and 48 hours before driving, confirmed in writing for every project.
Fast cure does not correct elevated moisture vapor in a concrete slab. We evaluate that risk before recommending the system, because a one-day installation only matters if the finished coating remains bonded.
08Process
A free on-site visit and slab and moisture evaluation, followed by a written scope. That scope states whether your floor needs a complete polyaspartic system or a polyaspartic topcoat over an epoxy base.
The slab is ground and repaired, and every material is measured and staged before each batch is mixed. Once the material is mixed, the working window is short.
For a full flake system, the base coat and flake broadcast go down in sequence. Each batch is mixed and applied inside a short working window — typically minutes, not hours.
The polyaspartic topcoat is applied and the floor is left to cure. Before we leave, we confirm the written access times: 24 hours for foot traffic and 48 hours for vehicles.
Polyaspartic's working time is measured in minutes, not hours. That is why sequencing, crew coordination and installer experience matter.
09Care
The warranty is stated in full above; this section covers what to expect from the coating over time and how to care for it.
Aliphatic polyaspartic coatings provide substantially better UV and color stability than many conventional epoxy coatings. That makes them especially valuable on patios, lanais and other sun-exposed concrete.
Better UV stability does not make the floor immune to long-term weathering, wear, heat or movement in the underlying slab.
High slab temperature shortens an already short working time. We staff and schedule around it.
10Cost
Square footage establishes the baseline. Repairs, coating removal and additional slab preparation can materially affect the final price.
Cracks, pitting and surface flaking all add repair work before the first coat, exactly as they would under epoxy.
Stripping a failed floor is a different day of work from coating a bare, sound, well-prepared slab.
A complete polyaspartic build prices differently from an epoxy base carrying a polyaspartic topcoat.
A stocked blend, a full-broadcast flake system, or a custom blend mixed to match your space.
Whether the space is occupied, whether we phase it bay by bay, and whether any work runs after hours.
Polyaspartic material generally costs more than epoxy. What it buys is UV stability and hot tire resistance, not a shorter wait.
11Recent work
Recent floors, captioned by system and space.
12Why SCDS

The owners
Owner Steve Davis and his son Wyatt both work in the field, taking part in site evaluations, slab preparation and coating installations across Central Florida.
Every new polyaspartic installation is backed by a 10-year warranty, extendable to a lifetime warranty with a maintenance plan.
Diamond grinding, moisture evaluation and written access times on every polyaspartic job — the preparation a fast cure does not shortcut.
An owner walks your space and writes the scope — not a salesperson passing you along.
Free estimates across the whole service area, with 5% off for military and first responders.
13Where we work
We serve Orlando and the surrounding Central Florida metro. View our full list of service areas.
14Questions
You can walk on it after 24 hours and drive on it after 48 — SCDS's standard minimums, confirmed in writing before the crew leaves. Florida humidity and slab temperature can extend either one.
Not better, different. UV stability and hot tire resistance are what polyaspartic flooring actually buys you. Epoxy gives you longer working time, more build and wider color options for the money.
Aliphatic polyaspartic coatings offer substantially better UV and color stability than many conventional epoxy coatings, which is the practical reason to specify one for a sun-exposed floor. It isn't immune to everything the sun does over time, though — expect the same gradual weathering any exterior finish sees.
Yes, with planning. High slab temperature shortens an already short working window, so summer installs take more staffing and scheduling care on our end.
The material generally does. What the extra material buys is UV stability and hot tire resistance. The access times are the same either way.
That's the hybrid build, and it's a common one: epoxy for the body, polyaspartic on top for UV stability. It only works over a sound, well-bonded epoxy floor, so we identify the existing coating and test its adhesion first.
Yes, exactly as much as epoxy does. Fast cure shortens the cure time, not the preparation — the slab still gets diamond-ground and evaluated for moisture before any coating goes down.
The same 10-year coatings warranty that covers our epoxy work, extendable to a lifetime warranty with a maintenance plan. Fast cure does not change the coverage. Proper preparation remains central to adhesion and long-term performance.
Free estimate
SCDS has been installing polyaspartic floors across Central Florida for over 15 years, on garages, patios and commercial spaces that need to hold their color and shrug off hot tires. Tell us about your space and we'll provide a free, no-obligation estimate.
Free, with no obligation, and 5% off for military members and first responders.
Call 407-501-0038